精品亚洲综合一区二区三区-精品一二三区-精品一级二级三级四级五级-精品一级国产一区二区三区7-精品一级毛片久久久-精品一级毛片免费视频

7*24Hours for you

15967710202/0577-65336533

company newsCurrent Pocation:homecompany news

The focus of polyurethane elastomer casting machine in the production process

Polyurethane elastomer casting machineCan be used for TDI, MDI and other prepolymer amine crosslinking or alcohol crosslinking system of CPU products production, compared with manual casting, casting machine casting quality is stable, high efficiency, stable temperature control and accurate proportional flow rate.

“Polyurethane elastomer casting machine”/

The key points to be paid attention to in the processing of elastomer products are:

1. Temperature control

When synthesizing prepolymer, the temperature is controlled between 75-82. Higher temperature will degrade the performance of the synthesized prepolymer, while lower temperature will prolong the polymerization time.

When mixed with MOCA, the prepolymer temperature is controlled between 90 and 110. Higher temperature will reduce the hardness and strength of the product, while lower temperature will increase the viscosity of the polymer, which is not conducive to casting operation.

The curing time is controlled at 130, and high curing time will decompose MOCA, which is not conducive to crosslinking reaction, and increase other side reactions. Lower will extend the molding time.

The melting temperature of MOCA can only be controlled as soon as it is melted into liquid, otherwise the liquid MOCA will become darker and decompose, which will affect the product performance.

2. Time control

Synthesis reaction for 2h, intermittent vacuum for 2h.

Then it is sealed and stored at room temperature. The synthesis of prepolymer should not exceed 4h at 75 temperature, and even less than 2h at 100 temperature, otherwise the performance of the product will be reduced.

Pouring should be completed within 1-2min, because the stability period after mixing the prepolymer and MOCA is very short, generally only 4-5min, otherwise the mixture solidifies and cannot be poured.

Molding curing time according to the shape and size of the product, generally between 15 to 30 minutes, to ensure that the product molding. For large products, the time is longer, requiring 2-3h.

3. Degassing of prepolymer

Degassing is the key to the success or failure of casting polyurethane elastomers.

Generally, two steps are needed to be controlled. After the synthesis of prepolymer, 75 vacuum degassing is used to remove most of the gas in the prepolymer during standing.

The prepolymer needs to be heated to 100-110 and degassed at high temperature before mixing with MOCA.

At the same time, vacuum (-0.095mpa) degassing for 10min, take out and stir the bottom bubbles to the top, and then vacuum and degassing for 10min.

The gas in the prepolymer can be discharged clean before mixed casting product with vulcanizing agent.


主站蜘蛛池模板: 成人午夜污污在线观看网站 | 亚洲国产成人精品女人久久久久久久18嫩草 | 日韩在线色欲一 | 摸丰满大乳奶水www免费 | 免费国精产品 | 中文字幕久热精品 | 亚洲美女视频一区二区三区 | 亚洲美女视频一区二区三区 | 少妇下蹲 | 国产精品国产三级 | 精品国产午夜福利在线观看 | 婷婷色香五月激情综合2025 | 亚洲av日韩精品av在线看 | 亚洲国产一区二区在线观看 | 国产精品爆乳奶水无码视频 | 国产三级久久久精品麻豆三级 | 99精品国产在热久久无码 | 国产精品户外野外 | 日本不卡在线观看视频 | 色欲影院激情久久综合 | 亚洲日本aⅴ片在线观看香蕉 | 国产无遮挡又黄又爽又色 | 亚洲欧美在线观看视频午夜 | 成人午夜无码福 | 人人影视软件官方正式版1.3.6安卓版 | 在线看片免费人成视频国产片 | 中字幕视| 欧美激情精品久久久久久大片 | 91视频免费版安卓版下载v1.0 | 成人影院www蜜桃网站 | 午夜免费观看福利片一区二 | 日韩黄色一级黄色片 | 91国自产精品一区二区三区 | 亚洲精品国产av成拍色拍婷婷 | 成人精品一区二区 | 伊人久久亚洲综合 | 三上悠亚久久精品亚洲 | 免费一级中文字 | 91在线码无精品秘入口是什么 | 无码人妻精品一区二区三区久久久 | 成人区免费av片在线观看 |